UPS status

UPS1 + UPS2

 

This UPS system (Uninterrupttable Power Supply) consists of two General Electirc SitePro S6_40 systems provided by Scanpocon, Odense, Denmark. The total nominel max. load is 80 KW, but the actual total load shouldn't exceed 65 KW (= ca. 80%). The load is shared in parallel between the two UPS's without any redundancy. The load should preferably be evenly distributed across the phases. Some of the connected systems currently are: Karlsen, The IBM-cluster, Freke, The Loke-cluster, The Farmor-cluster, The Archive
Sat Jul 31 18:26:25 CEST 2010 :            
Remaining time on battery           35 min
Battery temperature           26 °C
Total UPS utillization           39 %
Total Power delivered           32 KW
Load on phases 37 % 38 % 43 %
Power on phases 10 KW 11 KW 11 KW
Voltage on phases 229 V 230 V 230 V
Current on phases 43 A 44 A 50 A
Input Voltage 408 V 410 V 409 V


UPS3

 

This UPS system (Uninterrupttable Power Supply) is a General Electirc LanPro LP33-80 system provided by Scanpocon, Odense, Denmark. The total nominel max. load is 80 KW, but the actual total load shouldn't exceed 65 KW (= ca. 80%). The load should preferably be evenly distributed across the phases. Some of the connected systems currently are: Grendel, The Farfar-cluster
Sat Jul 31 18:26:26 CEST 2010 :            
Remaining time on battery           1000 min
Battery temperature           25 °C
Total UPS utillization           0 %
Total Power delivered           0 KW
Load on phases 0 % 0 % 0 %
Power on phases 0 KW 0 KW 0 KW
Voltage on phases 0 V 0 V 0 V
Current on phases 0 A 0 A 0 A
Input Voltage 236 V 238 V 237 V